What happens when quality inspection fails

What happens when QC fails: the options, the negotiation, and the evidence you need.

The options

OptionWhen
Reject the batchDefects exceed the agreed allowance
Accept with discountUsable but below spec
Partial reworkSpecific, fixable issues
Full reworkStructural defects, time allows

Why the allowance matters

No batch is perfect; the industry works on defect allowances written into the order — often 1–3% depending on category. QC failure means exceeding the agreed number, not finding a single flaw. Write the allowance before production.

The evidence stack

Inspection report, photos against the approved sample, measured specs versus the written specification, chat records. The outcome of a QC dispute is decided by how well the failure was documented, not how loudly it was argued.

The payment linkage

Hold the balance until inspection passes. Escrow gives you the leverage; the inspection gives you the facts. Together they turn "QC failed" from a disaster into a process step.

Got the picture? Get the number. The 1688 landed cost calculator adds agent fees, freight, duty and FX to the ticket price, and shows your true cost per unit.